web analytics

How To Install A Geyser Step By Step?

Quick Summary

This comprehensive blog post provides a step-by-step guide on how to install a geyser, covering the basics, safety precautions, and specific instructions for different types of geysers. It also highlights the importance of proper installation and offers additional considerations for vertical geysers and low-pressure systems. By following these guidelines, readers can ensure a successful and safe geyser installation.

Understanding the Basics of Geyser Installation

Proper geyser installation is crucial for ensuring efficient and safe operation. Before diving into the installation process, it’s important to understand the basics of geysers and their installation requirements.

Safety Precautions for Geyser Installation

When installing a geyser, safety should be a top priority. Here are some important safety precautions to keep in mind:

  • Ensure the electricity and water supply to the geyser are switched off before starting the installation.
  • Wear appropriate safety gear, such as gloves and safety glasses, to protect yourself during the installation process.
  • If you’re unsure about any aspect of the installation, it’s best to consult a reputable plumber or professional.

Step-by-Step Guide to Installing a Geyser

Follow these step-by-step instructions to install a geyser:

1. Gathering the necessary tools and materials

Before starting the installation, make sure you have all the required tools and materials, such as a wrench, pipe cutter, Teflon tape, and the geyser itself.

2. Choosing the right location for the geyser

Select a suitable location for the geyser, considering factors such as accessibility, ventilation, and proximity to the water supply and electrical connections.

3. Preparing the installation area

Clean and prepare the installation area, ensuring it is free from any debris or obstructions.

4. Installing the drip tray

Place a plastic or tin plate drip tray beneath the geyser to collect any potential water leaks. Connect a drain pipe to remove the water from the tray.

5. Installing vacuum breakers

Install small brass vacuum breakers to prevent water siphoning out of the geyser and to prevent a vacuum from forming in the tank.

6. Installing the shut-off valve, pressure control valve, and overflow pipe

Connect a shut-off valve on the cold water side, along with a Pressure Control Valve (PCV) and an overflow pipe connected to the PCV.

7. Mounting the temperature and pressure safety valve (T&P valve)

Mount the T&P valve on the geyser towards the top, with a metal pipe connected to it leading directly out of the building.

8. Ensuring proper support for the geyser

Make sure the weight of the geyser is adequately supported on the roof trusses or other suitable structures.

9. Installing the electrical isolator switch and ensuring proper grounding

Install an isolator switch within about 1m of the geyser and ensure that the geyser and copper pipes are properly earthed.

10. Installing the thermostat and element cover

Place a cover over the thermostat and element to protect them from damage and ensure safe operation.

11. Choosing the right pipe materials

Use copper or galvanized steel pipes for the water inlet and outlet connections, and steel or copper pipes for the PCV and T&P vent pipes.

12. Lagging the pipes for insulation

Wrap the pipes with lagging material to prevent heat loss and freezing.

13. Testing the geyser installation

Once the installation is complete, turn on the water and electricity supply to the geyser and test its functionality. Check for any leaks or issues and make necessary adjustments.

Additional Considerations for Vertical Geysers

Vertical geysers may have some differences in installation requirements compared to horizontal geysers. It’s important to consider these differences and follow the manufacturer’s instructions for vertical geyser installations.

Understanding Low-Pressure Geyser Systems

Low-pressure geyser systems have their own unique installation considerations. While less common, it’s important to understand the specific requirements for low-pressure geysers if you are installing one.

Conclusion

Proper geyser installation is essential for efficient and safe operation. By following the step-by-step guide and considering the specific requirements for your geyser type, you can ensure a successful installation. Remember to prioritize safety and consult a professional if needed.

Understanding the Basics of Geyser Installation

Installing a geyser is an essential task for ensuring hot water supply in your home. Whether you are replacing an old geyser or installing a new one, it is important to understand the basics of geyser installation. This section will provide an overview of the geyser installation process, emphasize the importance of following safety guidelines, and highlight the different types of geysers and their specific installation requirements.

Overview of Geyser Installation Process

The geyser installation process involves several steps to ensure proper functioning and safety. These steps typically include gathering the necessary tools and materials, preparing the installation area, installing the drip tray, vacuum breakers, shut off valve, pressure control valve (PCV), temperature and pressure safety valve (T&P valve), ensuring proper support for the geyser, installing the electrical isolator switch and proper earthing, covering the thermostat and element, choosing the right pipe materials, and lagging the pipes to prevent heat loss and freezing.

Importance of Following Safety Guidelines

When it comes to geyser installation, safety should always be a top priority. Following safety guidelines ensures the well-being of both the installer and the occupants of the property. It is crucial to adhere to electrical safety regulations, use proper insulation and protective gear, and consult professionals if needed. By following safety guidelines, you can minimize the risk of accidents, electrical hazards, and water damage.

Different Types of Geysers and Their Installation Requirements

There are various types of geysers available in the market, and each type has its own installation requirements. The most common types include high-pressure geysers, low-pressure geysers, and vertical geysers. High-pressure geysers are the most commonly used and require specific components such as a drip tray, vacuum breakers, shut off valve, PCV, T&P valve, proper support, electrical isolator switch, and suitable pipe materials. Low-pressure geysers have significantly different installation requirements, while vertical geysers may have some variations in the installation process.

Step 1: Gathering the Necessary Tools and Materials

Before you begin the geyser installation process, it is important to gather all the necessary tools and materials. Having everything you need beforehand will ensure a smooth and efficient installation. Here is a list of the tools and materials you will need:

Tools:

  • Adjustable wrench
  • Pipe wrench
  • Tape measure
  • Hacksaw
  • Drill
  • Screwdriver
  • Level
  • Plumber’s tape
  • Wire cutters
  • Electrical tester

Materials:

  • Geyser unit
  • Drip tray
  • Vacuum breakers
  • Shut off valve
  • Pressure control valve (PCV)
  • Temperature and pressure safety valve (T&P valve)
  • Support brackets
  • Electrical isolator switch
  • Copper or galvanized steel pipes
  • Lagging material

Having all the required tools and materials ready before you start the installation process will save you time and ensure that you have everything you need to complete the job. It is also a good idea to double-check the list to make sure you haven’t missed anything.

Step 2: Preparing the Installation Area

Before starting the geyser installation process, it is important to ensure that the chosen location is suitable for installation. Follow these steps to prepare the installation area:

  1. Choose a suitable location: Select a location that meets the necessary requirements for geyser installation. It should be easily accessible and have enough space to accommodate the geyser and its components.
  2. Clear the area: Remove any obstacles or debris from the installation area. This will ensure a clean and safe working environment during the installation process.
  3. Make necessary preparations: Take the following steps to prepare the installation area:
    • Check for proper ventilation: Ensure that the installation area has adequate ventilation to prevent the accumulation of gases or fumes.
    • Check for water supply: Ensure that there is a reliable water supply available near the installation area. This will be necessary for connecting the geyser to the water source.
    • Check for electrical supply: Ensure that there is a nearby electrical supply point for connecting the geyser to the power source. It is important to have a dedicated electrical circuit for the geyser to avoid overloading.
    • Measure and mark the installation area: Use a measuring tape to determine the exact location and dimensions for installing the geyser. Mark the area accordingly to ensure accurate placement.

By properly preparing the installation area, you can ensure a smooth and efficient geyser installation process. This will help in avoiding any potential issues or complications during the installation and ensure the longevity and functionality of the geyser.

Step 3: Installing the Drip Tray

When installing a geyser, it is important to include a drip tray. A drip tray serves as a protective measure to catch any water that may leak from the geyser, preventing damage to the surrounding area. Here is a step-by-step guide on how to install a drip tray:

  1. Choose a suitable location for the drip tray beneath the geyser. It should be positioned in a way that allows easy access for maintenance and cleaning.
  2. Ensure that the surface where the drip tray will be placed is level and stable.
  3. Place the drip tray on the designated spot, making sure it is aligned properly.
  4. If the drip tray has pre-drilled holes, use them as a guide to mark the corresponding spots on the surface.
  5. Remove the drip tray and drill pilot holes on the marked spots.
  6. Place the drip tray back in position and secure it by inserting screws through the pilot holes.
  7. Tighten the screws using a screwdriver or drill, ensuring that the drip tray is securely fastened to the surface.
  8. Check the stability of the drip tray by gently applying pressure to different areas. It should not move or wobble.
  9. Connect a drain pipe to the drip tray to allow water to flow out. Ensure that the drain pipe is directed away from any structures or areas that may be damaged by water.
  10. Test the drip tray by pouring a small amount of water into it. Check if the water drains properly through the drain pipe.

Installing a drip tray is a crucial step in geyser installation as it helps prevent water damage and provides an early indication of any leaks. By following these steps, you can ensure that your geyser is properly protected and functioning efficiently.

Step 4: Installing Vacuum Breakers

Vacuum breakers play a crucial role in geyser installation by preventing water siphoning out of the geyser and preventing a vacuum from forming in the tank. These small brass components are essential for maintaining the proper functioning and safety of the geyser.

Here is a step-by-step guide on how to install vacuum breakers:

  1. Locate the cold water inlet pipe on the geyser.
  2. Ensure that the water supply to the geyser is turned off.
  3. Take the vacuum breaker and apply plumber’s tape to the threaded end.
  4. Screw the vacuum breaker onto the cold water inlet pipe, ensuring it is tightly secured.
  5. Use a wrench to tighten the vacuum breaker further, if necessary.
  6. Repeat the process for any additional vacuum breakers required for your geyser installation.

It is important to note that the number of vacuum breakers needed may vary depending on the specific geyser model and installation requirements. Consult the manufacturer’s instructions or a reputable plumber for guidance.

By installing vacuum breakers correctly, you can ensure the proper functioning and safety of your geyser, preventing any potential issues related to water siphoning or vacuum formation.

Step 5: Installing Shut Off Valve and Pressure Control Valve (PCV)

When installing a geyser, it is crucial to include a shut off valve and a pressure control valve (PCV) in the system. These components play a vital role in controlling the flow of water and maintaining the desired pressure within the geyser.

Here is a step-by-step guide on how to install the shut off valve and PCV:

  1. Locate the cold water supply pipe that will be connected to the geyser. This pipe should be accessible and close to the installation area.
  2. Measure and mark the section of the pipe where the shut off valve will be installed. Ensure that there is enough space for the valve and any necessary fittings.
  3. Using a pipe cutter, carefully cut the marked section of the pipe. Make sure to create a clean and straight cut.
  4. Prepare the shut off valve by removing any protective caps or packaging. Ensure that the valve is in the closed position before installation.
  5. Apply plumber’s tape or thread sealant to the male threads of the shut off valve.
  6. Insert the threaded end of the shut off valve into the cut section of the cold water supply pipe. Tighten the valve using an adjustable wrench or pliers, ensuring a secure connection.
  7. Next, locate the PCV that will be installed on the cold water side of the geyser. The PCV helps regulate the pressure inside the geyser and prevents it from exceeding safe levels.
  8. Apply plumber’s tape or thread sealant to the male threads of the PCV.
  9. Insert the threaded end of the PCV into the remaining opening of the shut off valve. Tighten the PCV using an adjustable wrench or pliers, ensuring a secure connection.
  10. Double-check all connections to ensure they are tight and leak-free.

Once the shut off valve and PCV are properly installed, they will provide control over the water supply and pressure within the geyser. This ensures the safe and efficient operation of the geyser system.

Step 6: Mounting the Temperature and Pressure Safety Valve (T&P Valve)

The Temperature and Pressure (T&P) valve is a crucial component in geyser installation as it helps regulate the temperature and pressure inside the geyser tank. It is designed to release excess pressure and prevent the geyser from exploding or causing damage in case of a malfunction.

Here is a step-by-step guide on how to mount the T&P valve:

  1. Locate the designated spot for mounting the T&P valve on the geyser. It is usually towards the top of the tank.
  2. Ensure that the area around the mounting spot is clean and free from any debris or obstructions.
  3. Apply plumber’s tape or thread sealant to the threads of the T&P valve to ensure a tight seal.
  4. Insert the T&P valve into the mounting spot and hand-tighten it. Use a wrench to securely tighten the valve, but be careful not to overtighten and damage the threads.
  5. Attach a metal pipe to the outlet of the T&P valve. This pipe should lead outside the building to safely discharge any excess pressure or hot water.
  6. Securely fasten the metal pipe to the T&P valve using appropriate fittings and clamps.
  7. Ensure that the discharge pipe is directed downwards and away from any areas where people may be present to prevent scalding or injury.
  8. Check for any leaks around the T&P valve and the connections. If there are any leaks, tighten the fittings or replace any faulty components.

Mounting the T&P valve correctly is essential for the safe operation of the geyser. It is recommended to consult a professional plumber if you are unsure about any step or encounter any difficulties during the installation process.

Step 7: Ensuring Proper Support for the Geyser

Proper support for the geyser is crucial to ensure its stability and prevent any potential damage. The weight of the geyser, especially when filled with water, can put strain on the roof trusses if not adequately supported. Here is a step-by-step guide on how to ensure proper support for the geyser:

  1. Inspect the roof trusses: Before installing the geyser, carefully examine the roof trusses to ensure they are in good condition and capable of supporting the weight of the geyser.
  2. Identify the suitable location: Choose a location on the roof trusses that can provide sufficient support for the geyser. It should be a sturdy and stable area.
  3. Measure and mark the position: Measure and mark the exact position where the geyser will be placed on the roof trusses. Use a measuring tape and a pencil to make accurate markings.
  4. Install support brackets: Install support brackets on the marked positions. These brackets will provide additional support for the geyser. Make sure to use brackets that are suitable for the weight and size of the geyser.
  5. Secure the geyser to the support brackets: Carefully lift the geyser and place it onto the support brackets. Ensure that it is securely fastened and stable.
  6. Double-check the stability: Once the geyser is in place, double-check its stability by gently shaking it. It should not wobble or move excessively. If there is any instability, adjust the support brackets accordingly.

By following these steps, you can ensure that the geyser is properly supported on the roof trusses, minimizing the risk of any damage or accidents.

Step 8: Installing Electrical Isolator Switch and Proper Earthing

An electrical isolator switch is an essential component in geyser installation as it allows for the safe disconnection of power to the geyser when needed. It acts as a switch that isolates the geyser from the electrical supply, making it easier to perform maintenance or repairs without the risk of electric shock.

Proper earthing is also crucial in geyser installation to ensure the safety of the electrical system. Earthing provides a path for electrical current to flow into the ground in the event of a fault, preventing the risk of electric shock and protecting the geyser and other electrical components from damage.

Here is a step-by-step guide on installing the electrical isolator switch and ensuring proper earthing:

  1. Locate a suitable position for the electrical isolator switch within 1 meter of the geyser. It should be easily accessible for maintenance purposes.
  2. Turn off the main power supply to the geyser at the distribution board.
  3. Drill holes in the wall or surface where the isolator switch will be mounted, ensuring it is securely fixed.
  4. Connect the live wire from the main power supply to the input terminal of the isolator switch.
  5. Connect the live wire from the output terminal of the isolator switch to the geyser’s electrical connection point.
  6. Connect the neutral wire from the main power supply directly to the geyser’s electrical connection point.
  7. Ensure that the isolator switch is in the “off” position before turning on the main power supply.
  8. Test the isolator switch by turning it on and off to ensure it is functioning correctly.
  9. Properly earth the geyser and copper pipes by connecting an earth wire from the geyser’s earthing terminal to a suitable earth electrode, such as a grounding rod or metal water pipe.
  10. Check the continuity of the earthing connection using a multimeter to ensure a proper earth connection.

It is important to note that electrical work should be carried out by a qualified electrician to ensure compliance with safety regulations and to avoid any potential hazards.

Step 9: Covering the Thermostat and Element

When installing a geyser, it is important to cover the thermostat and element properly. This ensures their protection and prevents any potential damage or accidents. Here is a step-by-step guide on how to cover the thermostat and element:

  1. Before starting, make sure the power to the geyser is turned off to avoid any electrical hazards.
  2. Locate the thermostat and element on the geyser. These are usually found on the side or near the bottom of the unit.
  3. Inspect the thermostat and element cover to ensure it is in good condition and free from any cracks or damage.
  4. If the existing cover is damaged, replace it with a new one that is compatible with your geyser model.
  5. Carefully remove the old cover by unscrewing or unclipping it from the geyser.
  6. Place the new cover over the thermostat and element, ensuring it fits securely and covers them completely.
  7. Use the provided screws or clips to fasten the cover in place. Make sure it is tight enough to prevent any movement.
  8. Double-check that the cover is properly aligned and there are no gaps or openings.
  9. Turn on the power to the geyser and test the thermostat and element to ensure they are functioning correctly.

By covering the thermostat and element, you protect them from dust, moisture, and accidental contact. This helps to prolong their lifespan and ensures the safe operation of your geyser.

Step 10: Choosing the Right Pipe Materials

When it comes to geyser installation, choosing the right pipe materials is crucial for ensuring a safe and efficient system. The type of pipe materials you use will depend on the specific components of the geyser installation. Here’s a step-by-step guide on choosing the right pipe materials:

1. Cold Water Inlet and Hot Water Outlet Pipes

The pipes that connect the cold water inlet and hot water outlet of the geyser should be made of either copper or galvanized steel. These materials are durable, corrosion-resistant, and suitable for carrying water at high temperatures.

2. Pressure Control Valve (PCV) and Temperature and Pressure Safety Valve (T&P Valve) Vent Pipes

The vent pipes connected to the PCV and T&P valve should also be made of either steel or copper. These materials can withstand high pressure and temperature, ensuring the safe release of excess pressure and hot water.

3. Lagging Pipes

To prevent heat loss and freezing, it’s important to lag the pipes with suitable insulation material. This can be done using foam pipe insulation or other insulation products specifically designed for pipes. Make sure to choose insulation materials that are compatible with the pipe materials used.

By choosing the right pipe materials for each component of the geyser installation, you can ensure the longevity and efficiency of your system. It’s important to consult with a professional plumber or refer to manufacturer guidelines to determine the most suitable pipe materials for your specific geyser installation.

Step 11: Lagging the Pipes

Properly lagging the pipes in your geyser installation is crucial to prevent heat loss and freezing. Lagging, also known as insulation, helps maintain the temperature of the water inside the pipes and prevents energy wastage. Here is a step-by-step guide on how to lag the pipes effectively:

  1. Start by measuring the length of the pipes that need to be lagged. This includes the pipes that go into and out of the geyser, as well as the pressure control valve (PCV) and temperature and pressure safety valve (T&P valve) vent pipes.
  2. Choose the appropriate lagging material. The lagging material should have good insulation properties and be resistant to moisture and heat. Common options include foam pipe insulation or fiberglass pipe wrap.
  3. Cut the lagging material to the measured length, ensuring it is long enough to cover the entire pipe.
  4. Open the lagging material and wrap it around the pipe, starting from one end and moving towards the other. Make sure the lagging material is snugly fitted and covers the entire length of the pipe.
  5. If using foam pipe insulation, secure it in place using adhesive tape or cable ties. For fiberglass pipe wrap, use adhesive tape to secure the ends and hold it in place.
  6. Repeat the process for all the pipes that require lagging, including the PCV and T&P valve vent pipes.
  7. Ensure that there are no gaps or exposed areas in the lagging. Any gaps can lead to heat loss or freezing of the pipes.
  8. Inspect the lagged pipes to ensure they are properly covered and secured. Make any necessary adjustments or additions if needed.

Lagging the pipes in your geyser installation is an important step to ensure energy efficiency and prevent potential issues. By following these steps, you can effectively insulate the pipes and protect them from heat loss and freezing.

Conclusion

Installing a geyser can be a complex process, but by following the proper steps and guidelines, you can ensure a safe and efficient installation. Here is a recap of the geyser installation process:

  1. Gather the necessary tools and materials.
  2. Choose the right location for the geyser.
  3. Prepare the installation area.
  4. Install the drip tray to collect any water leakage.
  5. Install vacuum breakers to prevent water siphoning and vacuum formation.
  6. Install the shut-off valve, pressure control valve, and overflow pipe.
  7. Mount the temperature and pressure safety valve (T&P valve) to release excess pressure.
  8. Ensure proper support for the geyser on the roof trusses.
  9. Install the electrical isolator switch and ensure proper grounding.
  10. Install the thermostat and element cover for safety.
  11. Choose the right pipe materials for the geyser connections.
  12. Lag the pipes to prevent heat loss and freezing.
  13. Test the geyser installation to ensure proper functioning.

It is crucial to prioritize safety during the installation process. Always follow safety precautions and guidelines to prevent accidents and ensure the longevity of your geyser. If you are unsure about any step or if your geyser installation differs significantly from the typical requirements, it is recommended to consult a reputable plumber or professional for assistance.

By following these guidelines and seeking professional help when needed, you can successfully install a geyser and enjoy a reliable hot water supply in your home.

References

  1. https://www.youtube.com/watch?v=6qqnYoV8Nxg
  2. https://www.home-dzine.co.za/diy/diy-geyser-safety.htm
  3. https://www.youtube.com/watch?v=mdA_kQJ-R88

Latest Questions Answered